Little Disciples, Big Space

Little Disciples, Big Space June 5, 2026 Every Sunday, more than 200 children come through our children’s ministry. We have the privilege of families entrusting these kids to us during some of their most formative years. Between their start in CM at one year old to their graduation from fifth grade, our kids will have […]
Sitting in our Sanctuary

Sitting in our Sanctuary May 22, 2026 After our leisurely stroll through our Lobby, it’s time to move into Quasimodo’s favorite room and ours! Say it with me now: Hunchback Of Notre Dame Sanctuary GIFfrom Hunchback Of Notre Dame GIFs When we first moved into our 501 location, we had an incredible 211 people in […]
Come on in, the Lobby’s fine

Come on in, the Lobby’s fine May 15, 2026 After months of speaking in generalities about the design of our new building, we were so excited to finally get to unveil it to the church family during the one year anniversary of our Treasuring Christ Generosity Initiative! We had just a few moments to share […]
In the Weeds (and Loving It)

In the Weeds (and Loving It) April 20, 2026 Since our last update, things have continued to move forward, even if there isn’t a dramatic story to tell this time around. Our Campus Expansion Planning Team has been meeting regularly with the Visioneering team to work through the Schematic Design phase, which is basically where […]
Quiet Progress

Quiet Progress February 13, 2026 Since our last update was so exciting, we have blissfully enjoyed a relatively boring month! Just normal meetings, moving forward, and taking the next steps one by one. Not a whole lot has visibly changed, but our Campus Expansion Project is quietly continuing to progress in the right direction. We […]
Barriers and Blessings: An Unexpected Opportunity

Barriers and Blessings: An Unexpected Opportunity January 14, 2026 Well, that got interesting. If you’ve been following our Campus Expansion project, you know that our focus has been on the 24,000 square foot 529 Van Ness building that we signed a lease for in July 2025. Over the past several months, our leadership has been […]
Basecamp

Basecamp OCTOBER 9, 2025 At this early stage of the design process, Visioneering organizes what they call “Basecamp” experiences. Imagining the design/build process as an expedition, Basecamp is the launching point, where our teams gather together at the base of the mountain, reflect on where we’ve come from, dream about what lies ahead, and orient […]
Brainstorming with Bob

Brainstorming with Bob September 18, 2025 One of our first steps after signing the lease for 529 Van Ness was to find the right architect to lead us through the design process for our campus. After our Planning Team met with several candidates, one firm was the front runner from the very beginning: Visioneering Studios. […]